Underpinning a house by 1m is a significant structural change, for this reason, planning permission had to be sought, causing delays with the project.
The biggest challenge, however, was the ground conditions. The ground was very sandy and had a very high-water table, meaning that every excavation would collapse in on itself. Every single one had to be braced and propped during the dig and then remained in place after to concrete at been poured.